- Commercial and mixed-use developments
- Retail and large-format facilities
- Public and institutional buildings
- Industrial and logistics infrastructure
The Barker Inlet Wetlands is a 170-hectare integrated stormwater and tidal management system, receiving inflows from multiple urban and industrial catchments and discharging into North Arm Creek.
The project involved the assessment, refurbishment, and upgrade of multiple tidal control structures, including:
Site inspections identified varying structural conditions across multiple gate locations (A–J), including:
Incon provided a structured and risk-based engineering approach focused on condition assessment, repair strategy, and design integration:
We take pride in delivering innovative and practical solutions which adds real value to our clients and the community. We strive for better outcomes that delivers a best possible solution by employing our technical expertise. We believe the real value in good engineering is breaking down a complex problem into a simple solution which underpins our philosophy of ‘do it right – the first time’.
Enquire about starting
a building project