- Commercial and mixed-use developments
- Retail and large-format facilities
- Public and institutional buildings
- Industrial and logistics infrastructure
The facility comprises a single-storey portal framed industrial building, incorporating:
As shown in the aerial layout and internal arrangement, the building is divided into:
The structure operates in a highly aggressive coastal environment, located within approximately 500 metres of seawater exposure, with continuous internal humidity due to open water processing systems.
Incon delivered a detailed engineering audit supported by practical remediation strategies:
Structural Integrity Assessment
Targeted Remediation Strategy
Steel Columns
Wall Systems (Bondor Panels)
Pipe Racks, Walkways and Access Systems
Corrosion Protection Strategy
The structural audit enabled CH4 Global to:
The project ensured that the facility could continue operating safely while supporting CH4 Global’s innovative aquaculture processes.
We take pride in delivering innovative and practical solutions which adds real value to our clients and the community. We strive for better outcomes that delivers a best possible solution by employing our technical expertise. We believe the real value in good engineering is breaking down a complex problem into a simple solution which underpins our philosophy of ‘do it right – the first time’.
Enquire about starting
a building project