- Commercial and mixed-use developments
- Retail and large-format facilities
- Public and institutional buildings
- Industrial and logistics infrastructure
The refurbishment works focused on the removal and modification of suspended concrete slabs over grit removal units and primary sedimentation tanks (PST), alongside associated structural interventions including lifting design, monorail review, and manway assessments.
The existing structure comprised:
The demolition methodology required controlled slab cutting, lifting, and staged removal, while maintaining stability of the remaining structure throughout construction.
Incon delivered a comprehensive and practical engineering solution integrating analysis, demolition methodology, and temporary works design:
We take pride in delivering innovative and practical solutions which adds real value to our clients and the community. We strive for better outcomes that delivers a best possible solution by employing our technical expertise. We believe the real value in good engineering is breaking down a complex problem into a simple solution which underpins our philosophy of ‘do it right – the first time’.
Enquire about starting
a building project