Introduction

Incon was engaged to provide engineering review, verification, and certification for an onsite wastewater management system (OWMS) at the Juguette & Somos Wines Cellar Door in McLaren Flat. The project required a detailed assessment of site conditions, wastewater loading, and system design to support regulatory approval and future operational flexibility.

Project
description

The project involved the assessment and design verification of a commercial onsite wastewater system for a cellar door development located at 333 Foggo Road, McLaren Flat SA .

Key design parameters included:

  • Development type: Cellar Door (commercial use)
  • Soil classification: Category 4 (weak clay loam)
  • Design loading rate: 6 mm/day
  • Effluent disposal area: ~94–100 m² depending on revision
  • System type: Pressure dosed septic soakage system

The design also incorporated:

  • Site slope of ~6.9%, requiring controlled drainage considerations
  • Soil permeability constraints (Ksat ≈ 0.12 m/day) influencing infiltration design










Challenge

  • The cellar door operates with peak weekend usage and lower weekday demand, requiring accurate modelling of fluctuating wastewater loads.
  • Minor discrepancies in occupancy/loading inputs (e.g. daily usage assumptions) directly impacted system sizing and compliance, requiring iterative review and correction.
  • The system needed to comply with:
    • SA Health Onsite Wastewater Systems Code (2013)
    • AS/NZS 1547:2012 standards









Solution

Incon provided a precise and adaptive engineering solution focused on design validation, optimisation, and compliance assurance:

  • Identified and resolved data inconsistencies in occupancy/loading calculations, ensuring:
    • Accurate weekly average usage
    • Correct downstream design parameters
    • Compliance with regulatory design flows
  • Verified a pressure dosed septic soakage system with:
    • Balanced storage to manage peak inflows
    • Controlled discharge rates (~600L/day)
    • Adequate effluent distribution area
  • Engineered system to:
    • Manage peak inflows (e.g. ~1460L/day during high usage periods)
    • Maintain storage and discharge equilibrium across the week
    • Prevent overloading of disposal fields









Key Engineering Value Delivered

  • Delivered accurate and compliant wastewater system certification
  • Prevented under/over-design risks through detailed validation of inputs
  • Enabled smooth council approval process
  • Optimised system for both current operation and future expansion
  • Provided robust design tailored to challenging soil conditions
  • Demonstrated strong coordination with consultant (Waterscope) to resolve design issues efficiently













Other Projects

We deliver project success and technical excellence.

We take pride in delivering innovative and practical solutions which adds real value to our clients and the community. We strive for better outcomes that delivers a best possible solution by employing our technical expertise. We believe the real value in good engineering is breaking down a complex problem into a simple solution which underpins our philosophy of ‘do it right – the first time’.