- Commercial and mixed-use developments
- Retail and large-format facilities
- Public and institutional buildings
- Industrial and logistics infrastructure
The project forms part of a broader council-led stormwater upgrade to improve drainage capacity and resilience within the Seaton and Grange catchment. Incon’s scope focused on the structural design of 2.4m x 1.2m reinforced concrete box culverts, including full documentation and independent third-party certification.
Key deliverables included:
The design was required to comply with:
This project involved several critical engineering and compliance challenges:
Additionally, the design needed to address durability, handling loads, and penetration detailing without compromising structural integrity.
Incon delivered a robust and compliant engineering solution through:
We take pride in delivering innovative and practical solutions which adds real value to our clients and the community. We strive for better outcomes that delivers a best possible solution by employing our technical expertise. We believe the real value in good engineering is breaking down a complex problem into a simple solution which underpins our philosophy of ‘do it right – the first time’.
Enquire about starting
a building project