The existing Tailings Leach Feed Tank (4241TK1075) had experienced significant underfloor corrosion and was at risk of failure, with potential to disrupt production for up to six months if not addressed .
To mitigate this risk, a bypass system was developed to reroute slurry flow directly from the thickener underflow pumps to the tailings leach feed pumps, eliminating reliance on the deteriorating tank during maintenance activities.
Incon’s scope included:
The design needed to align with strict operational, safety, and constructability requirements for a live mining and processing facility.
Incon delivered an optimised and constructible structural solution tailored to the constraints of the Olympic Dam site:
The completed design enabled the successful implementation of a bypass system that:
We take pride in delivering innovative and practical solutions which adds real value to our clients and the community. We strive for better outcomes that delivers a best possible solution by employing our technical expertise. We believe the real value in good engineering is breaking down a complex problem into a simple solution which underpins our philosophy of ‘do it right – the first time’.